Case Studies

Case Studies.

We don’t measure our work only by what we built. We look at what changed on site afterward: who can now run it, and what became faster, safer or clearer. These are our XPression case studies.

01

CASE 1

U18 NISSIN TOP LEAGUE

HAPPINESS ARENA, Nagasaki · August 2026

U18 NISSIN TOP LEAGUE 1 U18 NISSIN TOP LEAGUE 2 U18 NISSIN TOP LEAGUE 3

Challenge

Approach

Result

Score Layout Design XPression Setup DataLinq Setup On-site Operation

SystemRoss Video XPression / DataLinq

CASE 4

Japanese pro baseball club: opening show and event content

Japanese professional baseball club · Opening show and event content for XPression

Challenge

Approach

Result

AE Content Conversion Event Content Conversion XPression Project Setup Delivery

SystemRoss Video XPression / Adobe After Effects

CASE 2

B.LEAGUE All-Star Weekend

Multi-day event

Working from game data sent by the Daktronics All Sport 5000, we handled XPression data updates and scorebug operation, plus related events over the weekend, all on a tight production schedule.

Photos not shown while permission is pending.

CASE 3

Professional basketball arena (Okinawa Arena)

Permanent arena

Real-time updates that stay legible on the arena’s large video boards during games. We structured the templates, data integration and operating workflow as one system, supporting stable game-day operation while keeping the operators’ workload down.

Photos not shown while permission is pending.

CASE 5

Regional event

Regional event in Japan

Everything from video content production to live operation, handled in one package.

We’ll add more projects here as they’re cleared for publication. If you’d like to see more detailed examples or photos, get in touch and we can share them individually.

Facing a similar challenge?

Tell us about your setup, and we’ll work out together how we can help.